The Studio Museum Harlem is a new 5-story, 82,000 SF American art museum devoted to work of artists of African descent. The new museum will contain a larger and enhanced gallery space, dedicated art receiving area, store and café, operations offices, and a climate-controlled gallery preparation suite.

Additional Services:

Lab testing for Concrete and Masonry


Replacement of 4 escalators at 2 locations in the Boroughs of Brooklyn and the Bronx and the replacement of 18 escalators at 7 locations in the Boroughs of Brooklyn, Manhattan.

 

Package A: Replacement of Four Escalators at Two locations – Inspection services provided by Hirani:

Concrete Cast-in-Place

Fire-Resistant Penetration and Joints

Standpipe Systems

Structural steel – Bolting & Welding

 

Package B: Replacement of Eighteen (18) Escalators at Seven (07) locations – Inspection services provided by Hirani:


Additional services:

Lab testing for Concrete and Masonry

The work performed under this contract consisted of design and construction of accessibility upgrades to the Livonia Avenue Station Canarsie Line on IRT Division in the Borough of Brooklyn.

The majority of the work consisted of Installing new elevators, building a new overpass for future connection to 3 train lines, installing new stairs, replacing existing mezzanine to platform level stair, steel repairs, signal work, extension of existing control house, and installation of a new stormwater drainage detention system.

Inspections covered by Hirani on this project consisted of Structural Steel Inspection, Non-Destructive Testing of Structural Steel, Concrete Steel Reinforcement, Concrete Sampling and Testing, Concrete Laboratory Testing, Masonry, Masonry Laboratory Testing, Soils, Fabricated Items, Stormwater Disposal and Detention System and Fire Resistance Penetrations and Joints.

The project includes a new maintenance shop, administrative offices and support buildings, track work with associated DC power connections, furniture and equipment and move in services.

The new Clifton Shop facility will include four maintenance tracks with overhead cranes, wheel truing machine, DC power stringer system and other maintenance-related equipment. It will also include ancillary spaces on first floor for utility rooms, machine shop, and a carpenter shop; offices on a partial mezzanine floor; administrative offices, area locker rooms and other support areas on the 2nd floor; a supply room, storage area and related offices on the partial third floor; and HVAC equipment on roof.

The design and construction has a contract duration for achievement of Substantial Completion within forty three (43) months from the date of the Notice of Award.

The existing Clifton Shop facility was constructed on landfill in a marshy area and contains several structures including the following:

The site lies within New York City Flood Zone 1

Hirani provided Special Inspection and Material Testing Services for NYCT and the Staten Island Railway for the Clifton Car Maintenance Shop at 45 Bay Street in the Borough of Staten Island.  The project consisted of demolition of the exiting shop facilities and, design and construction of a new rail car maintenance shop approximately 93,300 square feet to replace the existing multiple building facilities currently in use.

44-36 Douglaston Parkway is a new 54-unit Condo community in 91,355 SF area with 8-stories (2-stories below grade).

Inspection Services provided by Hirani:

Additional Services:

Lab testing for Concrete and Masonry

The Work performed under this Contract was done as a design-build contract.  The scope was as follows:

Hirani provided the following services: