The work performed under this contract consisted of design and construction of accessibility upgrades to the Livonia Avenue Station Canarsie Line on IRT Division in the Borough of Brooklyn.
The majority of the work consisted of Installing new elevators, building a new overpass for future connection to 3 train lines, installing new stairs, replacing existing mezzanine to platform level stair, steel repairs, signal work, extension of existing control house, and installation of a new stormwater drainage detention system.
Inspections covered by Hirani on this project consisted of Structural Steel Inspection, Non-Destructive Testing of Structural Steel, Concrete Steel Reinforcement, Concrete Sampling and Testing, Concrete Laboratory Testing, Masonry, Masonry Laboratory Testing, Soils, Fabricated Items, Stormwater Disposal and Detention System and Fire Resistance Penetrations and Joints.