Marine Parkway Bridge

The Work performed under this Contract was done as a design-build contract.  The scope was as follows:

  • Replacement and modernization of two (2) tower elevators systems including associated lighting in the elevator cabs, shaft way and landings and new enclosure of elevator shaft. Existing elevator systems to be replaced with rack and pinion type systems.
  • Installation of new weather resistant shaft enclosure façade, relocation of existing elevator shaft conduits, lighting, and associated hardware
  • Replacement of Elevator Skeleton platform lighting and marine navigation lights under roadway
  • Abatement and painting of eight main sheaves
  • Miscellaneous Mechanical and Electrical system upgrades and replacements

Hirani provided the following services:

  • Inspected civil and structural work and confirmed that it is constructed in accordance with the approved contract documents and shop drawings.
  • Verified that materials and equipment delivered to the jobsite were in accordance with the approved contract documents.
  • Provided office engineering.
  • Provided Special Inspection for the Contractor (Kiewit)